Ca4r3smtuMakale Ca4r3smtuMakale
  • 24-11-2016
  • Physics
contestada

How much work does it take to move a 50 μC charge
against a 12 V potential difference?

Respuesta :

syed514
syed514 syed514
  • 27-11-2016
work =V*Q =12*50*10^-6

The total work done will be equal to 

work = V.Q

which means 

w= 12 . 50.10^-6
Hence,
w= 0.0006 J
Answer Link

Otras preguntas

Somebody please answer this i’ll give brainly Which is more consistent across different substances: the relationship between number of molecules and the number
Why should a prince not worry too much about “the stigma of cruelty”? How can being too compassionate actually be worse for the country? Source: Excerpt from th
what is the distance between "-8" and 14 on a number line
If 15 men can do a piece of work in 30 days, in how many days can 10 men complete the same work?
A yellow train of mass 100 kg is moving at 8 m/s toward an orange train of mass 200 kg traveling in the opposite direction on the same track at a speed of 1 m/s
F(x) = 4x + p g(x) = px+1 Fg(x) = 12x+ q Find the value of p and q
8 to 11 do it with equations thx
Help Asap Select ALL the correct answers. Which three statements describe results of the Occupation of Alcatraz? It generated financial support for Native Ameri
6 The bar chart shows the A-level mathematics grades achieved by some students one year. A-level grades 120 100- 80 Frequency 60 40 20 om 0 A* A B D E U С Grade
Find the perimeter of the figure. ASAP PLEASE