in an agile team, who is responsible for tracking the tasks​

Respuesta :

kmbryg kmbryg
  • 23-09-2019

Answer:

Project Manager

Explanation:

PM is overall responsible for delivering the project. He is doing this by coordinating day-to-day activities and tasks. He can delegate various tasks to responsible team members, but that means that he also needs to track the progress.

Answer Link

Otras preguntas

What are two of the building blocks that help make up social structure
What animal or color can symbolize kindness, naivety, shyness, or mysterious?
A historian is writing an essay explaining how changing technology has led to cultural shifts throughout the world. He wants to include a passage meant to inspi
… He suffered much from a morbid acuteness of the senses; the most insipid food was alone endurable; he could wear only garments of certain texture; the odors o
Rearrange the formula d = m/ v for v.
Find the equation of the quadratic function with zeros at -1 and 1 and a vertex a t0,-6
What is the surface area of the outside of a cube shaped closed-top water tank whose edge length is 7.2ft ?
How does Fuller develop an argument for women’s rights?
What is the average rate of change between March 15 and June 15? A. 2.6 degrees Fahrenheit B. 3.9 degrees Fahrenheit C. 5.2 degrees Fahrenheit D. 7.8 degrees Fa
Dave, Kurt, and Chris buy 3 different shirts. In how many selections can they distribute the shirts equally among themselves?