Seudónimo Seudónimo
  • 22-01-2019
  • Business
contestada

_____ is work done to keep equipment in good working order. Defragmentation Preventive maintenance Virus protection A maintenance schedule

Respuesta :

Аноним Аноним
  • 22-01-2019

Hello Boss!

Defragmentation Preventive maintenance

Hope this helped

Answer Link

Otras preguntas

What is the sum of 1/9, 2/3, and 5/18? A. 19/18 B.4/15 C. 12/9 D. 8/20
The peripheral nervous system _____ A. consists of all body nerves B. Includes the brain and spinal cord C. Is composed of two types; somatic and autonomic D. I
What are the basic si units for the wavelength of light?
The plasma membrane is a _______ bilayer.
Answer it and show your work. Which letter choice is it.
What did William smith, Benjamin Richardson, and Joseph Townsend create?
How does carbon move from the atmosphere to plants
Use guess-and-check to find two numbers that have the sum of 8 and a difference of 2. A. 6 and 2 B. 6 and 4 C. 4 and 4 D. 5 and 3
why did the untied states establish the open door policy? A to ensure that it could coduct trade with and exert influence in china. B to encourage immigration f
what is the measure of XY?