kawasiwilson6530 kawasiwilson6530
  • 22-07-2018
  • Social Studies
contestada

"personnel who need to take part in disaster recovery planning include:"

Respuesta :

kelseab1212
kelseab1212 kelseab1212
  • 23-07-2018
All IT/IS technical staff all the way up to CEO.
Answer Link

Otras preguntas

Bijan has agreed to run a half marathon to raise money for charity each day before school bijan runs a 2.4 mile route around his neighborhood then each day afte
Explain a consequence of the Cuban missile crisis
I need help please if m<MNR=43 and m<MNP=84 find: m<RNP​ subtract or add
(-36) divided by (-8) = ? Please helpppp I’m studying for finals and idk how to do it :(( help please
the equation p = 1.95t^2 + 12.25t + 125 approximates the average sale price p of a house (in thousands of dollars) for years t since 2010 what is the best estim
what is the name of tetranitrogen dichloride?
Why did the U.S engage in imperialism?
A pyramid has a base that is a right triangle with legs measuring 15 cm and 24 cm. The height of the pyramid is 13 cm. What is the volume of the pyramid? Ente
Pls. Help me solve with this math problem Determine the slope given the difference of two functions.
1.fortniteOne day, a person went to a horse racing area. Instead of counting the number of humans and horses, he counted 74 heads and 196 legs. How many humans